{"id":126,"date":"2014-12-21T03:55:15","date_gmt":"2014-12-21T03:55:15","guid":{"rendered":"http:\/\/foretruss.yorkdigitalsolutions.com\/?p=126"},"modified":"2014-12-21T03:55:15","modified_gmt":"2014-12-21T03:55:15","slug":"standard-responsibilities-in-the-design-process-involving-metal-plate-connected-wood-trusses","status":"publish","type":"post","link":"https:\/\/fore-engineering.ca\/fr\/2014\/12\/standard-responsibilities-in-the-design-process-involving-metal-plate-connected-wood-trusses\/","title":{"rendered":"Responsabilit\u00e9s standard dans le processus de conception impliquant des fermes en bois reli\u00e9es par des plaques m\u00e9talliques"},"content":{"rendered":"<table>\n<tr>\n<td style=\"padding-bottom: 0px;\" colspan=\"3\" height=\"20\">The TPIC standard defines the design responsibilities of the individuals and\u00a0organizations involved in the preparation, submittal, review and approval of\u00a0each Truss Design Drawing and Truss Placement Plan associated with the use of\u00a0metal plate connected wood trusses. These guidelines are presented as industry\u00a0standard practice. The guidelines are not intended to preclude alternate\u00a0provisions as agreed upon by the parties involved.to view the guidelines for the handling, erection and bracing of wood trusses please click the following link on the TPIC website <a class=\"style27\" href=\"http:\/\/tpic.ca\/handling.pdf\">here<\/a> <\/td>\n<\/tr>\n<\/table>","protected":false},"excerpt":{"rendered":"<p>The TPIC standard defines the design responsibilities of the individuals and\u00a0organizations involved in the preparation, submittal, review and approval of\u00a0each Truss Design Drawing and Truss Placement Plan associated with the use of\u00a0metal plate connected wood trusses. These guidelines are presented as industry\u00a0standard practice. The guidelines are not intended to preclude[&#8230;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-126","post","type-post","status-publish","format-standard","hentry","category-technical"],"_links":{"self":[{"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/posts\/126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/comments?post=126"}],"version-history":[{"count":1,"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/posts\/126\/revisions"}],"predecessor-version":[{"id":127,"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/posts\/126\/revisions\/127"}],"wp:attachment":[{"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/media?parent=126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/categories?post=126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fore-engineering.ca\/fr\/wp-json\/wp\/v2\/tags?post=126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}